KELSET Traffic Safety Study

Share on Facebook Share on Twitter Share on Linkedin Email this link

The survey to receive comments on the draft report is now closed. A final revised draft report, incorporating survey results, is under development and final consultation with the School District & Administration, the local Parent Advisory Council and the local Residents Association is underway. Currently the final draft report is scheduled to be presented to Council at the meeting on September 20, 2021.

BACKGROUND: The District of North Saanich engaged WATT Consulting Ltd. to prepare a traffic safety study in the vicinity of KELSET Elementary School. The study will consider the movements and interactions of all users - vehicles, cyclists and pedestrians - and will suggest infrastructure and operational improvements to increase safety. Field measurements and observations along with school community and local resident feedback will inform the options developed to make the corridor safer for all.


The survey to receive comments on the draft report is now closed. A final revised draft report, incorporating survey results, is under development and final consultation with the School District & Administration, the local Parent Advisory Council and the local Residents Association is underway. Currently the final draft report is scheduled to be presented to Council at the meeting on September 20, 2021.

BACKGROUND: The District of North Saanich engaged WATT Consulting Ltd. to prepare a traffic safety study in the vicinity of KELSET Elementary School. The study will consider the movements and interactions of all users - vehicles, cyclists and pedestrians - and will suggest infrastructure and operational improvements to increase safety. Field measurements and observations along with school community and local resident feedback will inform the options developed to make the corridor safer for all.


  • CLOSED: This survey has concluded.

    We Want to Hear from You!

    Based on the public/stakeholder engagement and the technical analysis completed over the last three months, the consulting team has prepared a draft report that is now ready for your review. The report includes a series of options on four topic areas:

    1. Crosswalk at Haro Park Terrace
    2. On-street Parking
    3. School Parking Lot Loop & Bus Loading Area
    4. Traffic Calming

    The purpose of this survey is to get your feedback on the options in each topic area. The results of this survey will be used by the consulting team to finalize their recommendations in the report before it goes to North Saanich Council. For detailed information about each option—including the list of the advantages and disadvantages of each— please see the draft report found in the Documents section.

    The survey should take approximately 10-15 minutes to complete. If you are completing this survey as a parent/guardian of a child(ren) who attends KELSET Elementary School, please complete one survey per family.

    Take Survey